Middlesex House is located in Edgware, Northern Greater London.
This prominent 8-floor building was originally built in the 1970’s and has been converted into 163 studio flats and limited one and two-bedroom apartments.
The project came with it's own interesting challenges, but the project was completed in 12 months
Middlesex House

West Coast MEP completed mechanical, electrical and public health installations comprising of:
| rainwater pipework | soil and vent pipework |
| main cold water | boosted cold water |
| plantroom ventilation | general basement ventilation |
| BMS | water treatment |
| dry risers | mechanical wiring |
| testing and commissioning |
- earthing and bonding
- rainwater pipework
- soil and vent pipework
- main cold water
- boosted cold water
- plantroom ventilation
- general basement ventilation
- BMS
- water treatment
- dry risers
- testing and commissioning
- mechanical wiring