Having completed other school plantroom renovations, West Coast MEP understand the importance of careful planning and timing of proposed works to cause minimal downtime and disruption.
The plantroom was finished with a painted floor, new door and lighting which was all installed by West Coast MEP.
William Austin School

West Coast MEP installed the complete new plantroom including:
| Three 320 Kw boilers, |
| Two 500 litre cylinders |
| One 960 Kw plate heat exchangers |
| Magma 3 Grundfos twin head and single head pumps |
| BMS system with heat meters and an IQView 4 controller |
| Pressurisation units |
| 600 litre Expansion vessels |
| Foil faced lagging with Isogenopak |
| Leak detection system |
- Three 320 Kw boilers
- Two 500 litre cylinders
- One 960 Kw plate heat exchangers
- Magma 3 Grundfos twin head and single head pumps
- BMS system with heat meters and an IQView 4 controller
- Pressurisation units
- 600 litre Expansion vessels
- Foil faced lagging with Isogenopak
- Leak detection system